Modular, Belgian-engineered BESS for industrial and commercial sites. ROI in 3–5 years.
Peak shaving and load shifting reduce your grid consumption during the most expensive hours. Typical payback in 3–5 years.
Millisecond switchover during grid outages. No downtime, no generator startup delay, no production loss. 99.99% uptime.
Every Belinus system is installed and serviced by our certified Belgian engineering team. Remote monitoring included.
Belinus BESS modular cabinet — indoor IP55 installation, LiFePO4 cells, active liquid cooling
Modular design: 48–400 kWh. Indoor/outdoor IP55 cabinets. LiFePO4 cells. Active liquid cooling.
AC-coupled. 50kW–500kW inverter range. 95.5% round-trip efficiency. 1C charge/discharge rate.
IEC 62619 certified. Multi-layer BMS. Fire suppression built-in. CE & TÜV Rheinland.
Modbus TCP, CAN bus, REST API. Real-time cloud dashboard. Automated peak shaving algorithms.
Pre-commissioned cabinets. 2-day on-site install. Remote diagnostics. Annual preventive service visit.
Move the sliders to see your estimated annual savings, payback period, and 10-year return.
30 minutes with a Belinus energy consultant. We’ll review your bill, site layout, and answer technical questions.
Pick a TimeTell us about your site and we’ll come back with a tailored proposal within 48 hours.